Horne 5 Project
Underground gold-copper-zinc-silver mining project in Rouyn-Noranda, initiated by Falco Resources. The MELCCFP registry confirms the environmental assessment file; the 2026 economic parameters and timing remain Falco disclosures, with no decree or construction financing represented here.
SOURCE STATUS
INVENTORY
Approved public inventory
BASIS
Canonical Quebec2035 registry-backed page
DIRECT SOURCES
4 source links in the record
ARTICLE CONTEXT
1 linked Quebec2035 publication
This block describes the visible review state of the page; it adds no new evidence.
PUBLIC SOURCES
Falco - 2026 feasibility study for the Horne 5 ProjectPUBLISHER: Falco Resources · PUBLISHED: 2026-06-17Falco - environmental authorization process updatePUBLISHER: Falco Resources · PUBLISHED: 2026-06-16MELCCFP registry - file 3211-16-018PUBLISHER: MELCCFPBAPE - Horne 5 dossier documentationPUBLISHER: BAPE
PROFILE
STAGE
Permitting
OUTPUT
Gold, copper, zinc, silver
METRICS
PRE-PRODUCTION CAPEX
C$1.75B
Falco technical disclosure, 2026 feasibility study; does not confirm construction financing.
AS OF: 2026-06-17
SOURCE: Falco - 2026 feasibility study for the Horne 5 ProjectAVERAGE ANNUAL PAYABLE GOLD
220,300 oz/a
Falco technical disclosure, 2026 feasibility study; project-plan projection, not production certainty.
AS OF: 2026-06-17
SOURCE: Falco - 2026 feasibility study for the Horne 5 ProjectREGULATORY PROCESS
MELCCFP / BAPE
Public environmental-assessment file and BAPE documentation; does not confirm a government decree.
AS OF: 2026-06-27
SOURCE: MELCCFP registry - file 3211-16-018ANNOUNCED MILESTONE
2026
Falco-disclosed timing for the environmental acceptability analysis; conditional and not equivalent to an authorization.
AS OF: 2026-06-16