Strategic projects under watch

An entry point into the public projects linked to Québec2035 regions, intelligence axes and publications.

Lanaudière

Matawinie Mine

Open-pit graphite mining project near Saint-Michel-des-Saints, in Lanaudière. NMG announced final investment decision and construction launch in May 2026.

Bécancour · Mauricie–Centre-du-Québec

Anode Material Plant (Bécancour)

Graphite-to-active-anode-material processing plant for lithium-ion batteries on the Bécancour industrial platform.

Nord-du-Québec / Eeyou Istchee James Bay

Troilus Project

Copper-gold-silver mining project north of Chibougamau. The 2024 feasibility study reports C$1.075B initial capex; the ESIA is treated as an active regulatory file.

Abitibi-Témiscamingue

Dumont Nickel Project

Large nickel-cobalt deposit near Amos-Launay in Abitibi-Témiscamingue. The public profile is treated as financing and execution-readiness, without confirmed construction.

Abitibi-Témiscamingue

Horne 5 Project

Underground gold-copper-zinc-silver mining project in Rouyn-Noranda, initiated by Falco Resources. The MELCCFP registry confirms the environmental assessment file; the 2026 economic parameters and timing remain Falco disclosures, with no decree or construction financing represented here.

Saguenay–Lac-Saint-Jean

Bégin-Lamarche Project

Igneous phosphate project in Saguenay–Lac-Saint-Jean. A 2026 resource and 2024 PEA are public; feasibility, engineering and demonstration of LFP-oriented concentrate remain development work.

Côte-Nord

Port of Baie-Comeau Terminal 5

Multi-use, multimodal wharf reconstruction project. The BAPE public information period ended on August 7, 2026; authorization, tenders and construction remain proponent-projected milestones.

Bas-Saint-Laurent

PPAW2 Wind Farm

291.4 MW wind project in the Témiscouata and Rivière-du-Loup RCMs. The BAPE public hearing is underway; 2027 construction and 2029 service are proponent objectives.

Nunavik

Crater Lake Project

Scandium project in Nunavik, currently accessible by aircraft or helicopter. Resources are public and a pre-feasibility study is being prepared; road access, power, permits, binding markets and construction financing remain to be demonstrated.