BACK TO HOME
STRATEGIC PROJECT

Troilus Project

Copper-gold-silver mining project north of Chibougamau. 2024 feasibility study at C$1.075B initial capex.

PROFILE
STAGE
Feasibility
OUTPUT
Copper, gold, silver
METRICS
INITIAL CAPEX
1075 M$ CA
2024 feasibility study
POWER ALLOCATION (SIGNAL)
70 MW
Allocation signal — public authorization not confirmed
RELATED PUBLICATIONS