STRATEGIC PROJECT
Troilus Project
Copper-gold-silver mining project north of Chibougamau. 2024 feasibility study at C$1.075B initial capex.
SOURCE STATUS
INVENTORY
Approved public inventory
BASIS
Canonical Quebec2035 registry-backed page
DIRECT SOURCES
No direct source links in the record yet; review pending
ARTICLE CONTEXT
2 linked Quebec2035 publications
METRICS
Source/asOf review pending: Initial capex, Power allocation (signal)
This block describes the visible review state of the page; it adds no new evidence.
PROFILE
STAGE
Feasibility
OUTPUT
Copper, gold, silver
METRICS
INITIAL CAPEX
1075 M$ CA
2024 feasibility study
POWER ALLOCATION (SIGNAL)
70 MW
Allocation signal — public authorization not confirmed
AS OF: 2026-06-19
RELATED PUBLICATIONS
JUNE 19, 2026ÉNERGIE
CONTEXT: CORRIDOR-ADJACENT ENERGY AND INFRASTRUCTURE
Could the Abitibi Energy Corridor Become Quebec's Most Important Execution Bottleneck?
The question is not whether Quebec has geology. It is whether the right megawatts can reach the right projects at the right time.
READ ARTICLE
JUNE 18, 2026ANALYSE
Troilus and Quebec's Execution Capacity
Troilus is not primarily a mining story. It is a test of whether Quebec can turn strategic ambition into executable industrial capacity.
READ ARTICLE