STRATEGIC PROJECT
PPAW2 Wind Farm
291.4 MW wind project in the Témiscouata and Rivière-du-Loup RCMs. The BAPE public hearing is underway; 2027 construction and 2029 service are proponent objectives.
SOURCE STATUS
INVENTORY
Approved public inventory
BASIS
Canonical Quebec2035 registry-backed page
DIRECT SOURCES
2 source links in the record
ARTICLE CONTEXT
2 linked Quebec2035 publications
This block describes the visible review state of the page; it adds no new evidence.
PUBLIC SOURCES
PROFILE
STAGE
Permitting
OUTPUT
Wind power
METRICS
CONTRACTED CAPACITY
291.4 MW
Capacity stated in the BAPE dossier; it is not a construction authorization.
AS OF: 2026-08-07
SOURCE: BAPE - PPAW2 wind projectPLANNED TURBINES
51
Configuration presented to the BAPE; may change before authorization.
AS OF: 2026-08-07
SOURCE: BAPE - PPAW2 wind projectESTIMATED INVESTMENT
Environ 1 G$ CA
Proponent estimate in the BAPE file, not equivalent to closed financing.
AS OF: 2026-08-07
SOURCE: BAPE - PPAW2 wind projectRELATED PUBLICATIONS
AUGUST 12, 2026ANALYSE
A plant can be 70% built and still be risky: how to assess Québec megaprojects
Construction percentage measures only part of risk. Québec2035 now tracks ten dimensions without hiding them in an average score.
READ ARTICLE
AUGUST 10, 2026ANALYSE
Mines are no longer the only bottleneck: roads, power lines and ports will decide what gets built
Québec's next strategic advantage depends less on isolated announcements than on assembling power, access, ports, permits, financing and markets.
READ ARTICLE